Structural Designing Course

Quantity Surveying Syllabus

Note : Course Duration 60 working Days for Quantity Surveying Course and each class will be of 03 hours

(03 x 60 = 180 hours + Live Project work).

Topics Under Quantity Surveying

  • Types of Footings
  • Types of columns
  • Types of Beams
  • Types of Slabs
  • Types of walls

Bill of Quantities (B.O.Q)

  • R.C.C- Footings
  • P.C.C-under Footings
  • Neck column
  • Tie beam and Strap beam
  • P.C.C,under Tie beams
  • Plinth beam or Ground Beams.
  • P.C.C.under Plinth Beams
  • Retaining wall
  • P.C.C,under Retaining wall
  • Water calculation
  • Rectangular sump
  • Circular sump
  • Septic tank
  • Lift pit
  • Earth work Excavation calculation
  • Back- Fill calculation
  • Abstract for the Quantity of Sub-structure
  • Bill of Quantities
  • Concrete proportions and Ratios with mix-design
  • Area of shuttering in m2
  • Area of bitumen paint in m2
  • Area of termite control in m2
  • Area of polythene sheet or Vapour Barrier in m2
  • Reinforcement in Kgs or Tones

Module - ll

  • Floor columns
  • Floor beams
  • Floor slabs
  • Stair cases (Typical & Semi-Circular)
  • Ramp (Straight & Semi-Circular)
  • Parking plat-form
  • Brick work (No. of bricks required)
  • Cement: Mortar required for brick work & Plastering
  • Wall putty calculation
  • Paint calculations in Litres
  • False-Ceiling Calculations in m2
  • Flooring Calculations
  • Wall Skirting Calculations
  • Wall Tiles (Ceramic Tiles) calculations

Bill of Quantities (B.O.Q)

  • Submittal report for the approval of materials
  • Project Stages Report
  • Project Deliverables Report
  • Weekly Report & Monthly Report
  • Variations
  • Value Engineering Meeting